Red River at Springbank Ferry
Miller County, Arkansas
The past week
Loading chart…
What floods at each level
- 44 ft
Expect major flooding between and near levees. The railroad bridge at Garland City, Arkansas must be closed and leveed over at this point. Expect major backwater flooding through the lower Sulphur River to approaching Lake Wright Patman.
- 41 ft
Move livestock and equipment to higher ground away from levees. Expect extensive flooding between and near levees.
- 39 ft
Expect flooding between and near levee systems with backwater flooding up through the lower Sulphur River.
- 38 ft
Expect flooding in between levees with backwater flooding affecting the lower Sulphur River.
- 32 ft
Expect flooding between levees. Livestock should be moved to higher ground.
Highest crests on record
| Date | Level | Flow |
|---|---|---|
| Jun 7, 2015 | 44.23 ft | 228,000 cfs |
More on Red River
Get an alert when Red River rises
Save this gauge in the free StormCast app and pick the level that matters to you. Your phone goes off when the water gets there.

