RIVER GAUGE
Los Berros Creek
San Luis Obispo County, California
Water level57.20 ft
Flow—
Last readingSep 16, 2026, 5:09 PM UTC (last recorded)
Action61.8 ft245 cfs
Minor flood63.8 ft
The past week
Loading chart…
When the water runs low
- 5 ft
Stage needed to inundate designated Gulf Sturgeon critical habitat below Jim Woodruff Lock and Dam.
- 3 ft
Temporary (not sustainable) operating level for of Scholz Power Plant
Get an alert when it rises
Save this gauge in the free StormCast app and pick the level that matters to you. Your phone goes off when the water gets there.

