Cane River (NC) at Mills Gap rd near Fletcher
Henderson County, North Carolina
The past week
Loading chart…
What floods at each level
- 14 ft
THE WATER TREATMENT PLANT EAST OF US HIGHWAY 25 WILL BE CUT OFF BY RISING WATER. WATER WILL OVERTOP THE RAILROAD TRACKS MAINLY SOUTH OF HOWARD GAP RD.
- 12 ft
PARTS OF OLD HENDERSONVILLE, HOWARD GAP, THE CARRIAGE AND JACKSON ROADS WILL BE FLOODED. PARKING LOTS AND SOME BUILDINGS JUST NORTH OF MILL GAP ROAD IN THE CANE CREEK INDUSTRIAL PARK WILL BEGIN TO FLOOD.
- 11 ft
PARTS OF HOWARD GAP AND OLD HENDERSONVILL ROADS WILL BE FLOODED. MOST AREAS BETWEEN THE CREEK AND THE RAILROAD WILL BE FLOODED. WATER WILL APPROACH THE WASTE WATER TREATMENT PLANT AREA AND BUILDINGS NEAR PARRISH MUNICIPAL ROAD.
- 10 ft
LOW AREAS ON HOWARD GAP RD BETWEEN US 25 AND JACKSON RD WILL FLOOD. WATER WILL APPROACH PARKING LOTS IN THE CANE CREEK INDUSTRIAL AREA.
- 9 ft
FURTHER FLOODING OF FIELDS ALONG THE CREEK NORTH AND SOUTH OF MILL GAP ROAD WILL OCCUR. FLETECHER COMMUNITY PARK WILL BE SURROUNDED BY WATER. ELEVATION = 2090 FT.
- 8 ft
WATER FROM A LOCAL CREEK WILL APPROACH THE FLETCHER COMMUNTIY PARK BALL FIELDS EAST OF HOWARD GAP ROAD. FIELDS ALONG THE CREEK WILL BEGIN TO FLOOD. CANE CREEK ROAD NEAR MILLS GAP ROAD WILL LIKELY BE FLOODED.ELEVATION = 2079 FT
- 7 ft
MOST LOCAL CREEKS THAT FEED INTO CANE CREEK WILL BE AT BANKFULL. ELEVATION = 2078 FT
- 2.2 ft
2.2 INCHES IN ONE HOUR WILL TAKE THE CREEK FROM 0.50 FT TO 4.2 FT.
- 1.5 ft
1.5 INCH IN 1.5 HRS ON ALREADY WET GRD CAUSED A 3.5 FT RISE.
Highest crests on record
| Date | Level | Flow |
|---|---|---|
| Jan 29, 2013 | 8.8 ft | — |
| Jan 24, 2010 | 8.54 ft | — |
| May 5, 2013 | 8.14 ft | — |
More on Cane River (NC)
Get an alert when Cane River (NC) rises
Save this gauge in the free StormCast app and pick the level that matters to you. Your phone goes off when the water gets there.

